Client portal

  • Scheduled maintenance - London Server - 28 February

    February 20, 2013 by Support
  • Interxion, the datacentre in central London where our server is hosted, have recently completed the build out of their newest 'Interxion LON2' facility.


    This new building is on the same campus as the existing datacentre, has access to the same range of networks
    (including LINX and major Tier-1 carriers) however it has been designed and built to the latest standards.

    We have decided to move our server to new 'Interxion LON2' facility.

    This means we are in the most modern, best connected datacentre in the heart of London.

        More than 1700m2 of equipped space
        8 MVA redundant grid supply
        2N UPS power
        N+1 cooling
        Access to over 50 Carriers
        Powered by 100% renewable energy
        ISO 27001-certified

    More information about the new facility is available at

    http://www.interxionlon2.co.uk/

    It will be necessary to power down the host server where your website is located and move it.

    Maintenance starts:

    28 February 22:00 GMT

    Maintenance ends:

    29 February 00:00 GMT

    Regards, 
    Alex